Usha Projects is executing the Ash Handling System for NALCO on an EPC basis. The scope covers design engineering, fabrication, erection, testing and commissioning of an ash slurry pipeline of 165 km from the captive power plant (CPP) at NALCO Angul to the mines void area.
Ash slurry transportation of this length calls for hydraulic design, careful route engineering, pipeline construction across varied terrain and disciplined commissioning, capabilities that Usha has built through its iron ore and ash slurry pipeline experience.
Scope of work
- Design engineering
- Fabrication
- Erection
- Testing and commissioning
Project particulars are taken from Usha Projects' own project records. For detailed credentials, please contact us.

More Projects
In progressTata Steel Kalinganagar Pipeline Works
Cross-country 1400 NB raw water pipeline from the river to the plant, plus underground and tunnel utility pipelines inside the plant.
View project
In progressRural Electrification, Nayagarh
Rural electrification works for Nayagarh, Odisha under RGGVY, executed through NTPC.
View project
CompletedBRPL Iron Ore Slurry Pipeline
90 km iron ore slurry pipeline from the mines, through villages, canals, railways and difficult terrain.
View projectHave a project in mind?